Wfs Incinerator, Shandong Better Waste Incinerator, 10-500kgs/Batch

Condition: New
Certification: GMA, QS, FDA, ISO, CE
Automation: Automatic
Screw: Single-Screw
Treatment: Pyrolysis
Temperature: 850-1250 Celsius Degree

Products Details

Basic Info.

Model NO.
WFS
Fuel
Diesel Oil or Natural Gas
Optional Color
Black, Silver, Grey
Transport Package
Steel Plate and Frame
Specification
10-500kgs/time
Trademark
Better
Origin
Shandong
HS Code
841780000
Production Capacity
500 Sets/Year

Product Description

Solid Waste Disposer, (10-500kgs/time), 3D Video Guide Installation &. Operation
Wfs Incinerator, Shandong Better Waste Incinerator, 10-500kgs/Batch

Solid Waste Incinerator component
Incinerator body, second combustion chamber, vaporizing chamber, absorption chamber, mixing chamber, draught fan, chimney, automatic control system with temperature showing.

Main Features:
1. Fuel: Diesel Oil/ or Natual Gas
2. Treating capacity: 10-500kgs/batch, 3-6times/day
3. Burn-out time: 2 hours (including cooling)
4. Two combustion chamber, fully burning.
5. No black smoke, emission compliance.
6. Highly insulated safe operation.

Widely Application: 
1.Infectious medical waste.
2.Animal carcass/ dead body, poultry leather, etc.
3.Daily/domestic garbage/ rubbish.
4. Package waste.
5. Disposalble plastic waste, like bottle, cup, bowl, tray.
6. Other solid waste.

1. Description

Medical waste incinerator possess the own intellectual property with compact size, high burning efficiency, automatic-control, reasonable burning technology, high degree of non-harm etc, it is an ideal choice for waste treatment of hospital, hotels, various stations and industries.

2. Advantage

1) Long lifetime
2) Totally enclosed operation
3) Suitable for treating infectious waste
4) Avoid secondary pollution
5) Simple operation

3. Main features

1)Both gas-motivated and oil-motivated are all can be preferred accordin to customers' needs.
2)Gasified incineration is used for burning syringe, paper waste, bandage, absorbent cotton and other medical wastes.
3)Daily waste can be burned once by gasified incineration.
4)Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5)Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.

4. Application

1)Hospitals
2)Hotels
3)Stations
4)Industries
5)Pets services

5. Models
Model
WFS-30

WFS-50

WFS-150

WFS-300

LDF-500

Burning Capacity

20-30kg/time  (3-6 times/day)

30-50kg/time (3-6times/day)

100-150kg/time (3-6times/day)

200-300kg/time (3-6times/day)

300-400kg/time(3-6times/day)

Incinerator Size       m (L*H*B)

1.45*0.9*1.75

1.8*1.15*3

2*1.4*3.5

2.2*1.4*3.8

3*2*4.8

Imputing Mouth Width (mm)

480*600

620*800

760*960

900*1100

1080*1280

Chimney External Diameter
(mm)

280

280

300

400

460

Draught Fan

0.37kw

0.37kw

0.5kw

1.1kw

1.1kw/0.55kw

Combustion  Improver  Device

0.11kw
Oil consumption: 4-6kg/h

0.11kw
Oil consumption: 4-10kg/h

0.11kw
Oil consumption: 4-10kg/h

0.22kw
Oil consumption: 7-14kg/h

0.22kw
Oil consumption: 7-14kg/h

Re-Burning Device

0.11 kw
Oil consumption 4-6 kg/h

0.11kw
Oil consumption: 4-10kg/h

0.22kw
Oil consumption: 7-14kg/h

0.37kw
Oil consumption: 10-20kg/h

0.37kw
Oil consumption: 15-26kg/h

Voltage

380v/220v

380v/220v

380v/220v

380v/220v

380v/220

WFS Incinerator Emission Standard:
 
No. Pollutant name Measuring unit Data
1 Blackness of Flue Gas Ringelamann Class 1
2 Smoke & Dust mg/m3 50
3 CO mg/m3 63
4 SO2 mg/m3 80
5 HF mg/m3 9
6 HCL mg/m3 15
7 NO2 mg/m3 300
100% guarantee of no visiable smoke, NO Smell.

Company profile:

Shandong Better Environmental Protection Technology Co., ltd, the largest environmental protection technology enterprise in Shandong Province, adopted the US technology,
With experience over 20 years on machinery, during the past decade, we won very good reputation among our customers all over the world, ,Turkey, Janpan, Saudi Arabia, Bangledesh, Iran, Iraq, Vietnam, Singapore, Maldives, Malaysia, Argentina, Comlombia, Ecuador, Mexico, Mongolia, UZ, etc, and got the National Patent for this product.
We are the sewage and waste treatment industry expert.

Our typical overseas experience:

1) 8 sets installed in Uzbekistan in United Nations support project to UZ hospitals;

2) 1 set of 500kgs/time incinerator installed in Cambodia Health Ministry.

3) 2 sets of 500kgs/time incinerator exported to Malaysia.

                     I'm Anna, within 12 hours quick reply,  

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours